Projects

  • Crosslinx Transit Solutions Constructors (CTSC) - Eglinton Crosstown LRT

  • Bipole III - Keewatinohk Converter Station AC Switchyard

    -

    The Keewatinohk Converter Station is located in northern Manitoba, northeast of Gillam. Construction began in 2013 with civil site preparation for the Keewatinohk Converter station, Construction Power, as well as continued development of the Keewatinohk Camp. The Keewatinohk AC switchyard contract was awarded June 2014 to MYR Transmission Services Canada (MTSC), and Construction Power was put into service July 2014. Pre-Testing and Commissioning activities were completed by MTSC in December…

    The Keewatinohk Converter Station is located in northern Manitoba, northeast of Gillam. Construction began in 2013 with civil site preparation for the Keewatinohk Converter station, Construction Power, as well as continued development of the Keewatinohk Camp. The Keewatinohk AC switchyard contract was awarded June 2014 to MYR Transmission Services Canada (MTSC), and Construction Power was put into service July 2014. Pre-Testing and Commissioning activities were completed by MTSC in December 2017 and turned over the Design-Builder SNC Lavalin for final T&C and acceptance by Manitoba Hydro.

    See project
  • Aegis Ashore Romania

    -

    DEVESELU, Romania - 2013-2015, Aegis Ashore system has been installed in Romania, as part of the Phased Adaptive Approach Phase II. This system will use Aegis BMD 5.0 CU and SM-3 Block IB to provide ballistic missile coverage of Southern Europe. Aegis Ashore is a land-based capability of the Aegis Ballistic Missile Defense (BMD) System to address the evolving ballistic missile security environment. The deckhouse and launchers are equipped with the Aegis BMD Weapon System and Standard Missile-3…

    DEVESELU, Romania - 2013-2015, Aegis Ashore system has been installed in Romania, as part of the Phased Adaptive Approach Phase II. This system will use Aegis BMD 5.0 CU and SM-3 Block IB to provide ballistic missile coverage of Southern Europe. Aegis Ashore is a land-based capability of the Aegis Ballistic Missile Defense (BMD) System to address the evolving ballistic missile security environment. The deckhouse and launchers are equipped with the Aegis BMD Weapon System and Standard Missile-3 (SM-3), with upgrades being phased in during this decade. Each Aegis BMD upgrade provides increased capability for countering ballistic missile threats.

    See project
  • USS Texas Battleship Structural Repair

    -

    AUSTIN — The Texas Parks and Wildlife Department has contracted with Taylor Marine Construction, Inc. to make the first significant structural repairs to the Battleship TEXAS in more than 20 years. March 14 marks the 99th anniversary of the battleship’s commissioning in 1912.

    Based in Beaufort, N.C., Taylor Marine has recent experience with historic battleships, spending almost $2 million in 2011 to replace a portion of the Battleship North Carolina steel hull. Repairs on the Battleship…

    AUSTIN — The Texas Parks and Wildlife Department has contracted with Taylor Marine Construction, Inc. to make the first significant structural repairs to the Battleship TEXAS in more than 20 years. March 14 marks the 99th anniversary of the battleship’s commissioning in 1912.

    Based in Beaufort, N.C., Taylor Marine has recent experience with historic battleships, spending almost $2 million in 2011 to replace a portion of the Battleship North Carolina steel hull. Repairs on the Battleship TEXAS are scheduled to begin in April.

    The $17.5 million repair contract for the Battleship TEXAS will accomplish about half of the structural repair needs of the battleship and is a first step in meeting the long-term goal of placing the USS TEXAS in a dry berth, according to Scott Stover, TPWD’s Infrastructure Division deputy director.

    During the repair work, the ship will remain open to the public as conditions allow, and visitors will see plenty of activity at the site, as well as construction equipment and an access barge on the north side of the ship.

    The repairs to the ship’s structural foundation will occur deep within the ship in areas rarely seen by the public. When completed in the fall of 2014, the repaired hull will not be evident to most visitors.

    See project
  • River Bluff High School

    -

    Beginning in August 2013, students will attend River Bluff High School. Nearly complete with the final stages of construction, the new high school made headlines for using existing soil from the school's location to create the bricks for the exterior of the building. Known as "River Bluff Red" brick, the school is using sustainable resources and design.

    Other creators
    • China Construction America of SC, Inc.
  • USS Battleship North Carolina - Hull Repairs

    -

    Taylor Brothers Marine Construction Co. of Beaufort designed and built a movable / form-fitting coffer dam that allowed them submerge, seal and then pump water out so they could work in an enclosed area to remove and replace deteriorating sections of the bow . Working from barges floated over the mud that surrounds the ship, Taylor Brothers workers were able to incrementally replace steel at the "wind-water" line where water meets the hull. On March 17, 2013 Taylor Brothers Marine will receive…

    Taylor Brothers Marine Construction Co. of Beaufort designed and built a movable / form-fitting coffer dam that allowed them submerge, seal and then pump water out so they could work in an enclosed area to remove and replace deteriorating sections of the bow . Working from barges floated over the mud that surrounds the ship, Taylor Brothers workers were able to incrementally replace steel at the "wind-water" line where water meets the hull. On March 17, 2013 Taylor Brothers Marine will receive the Carolina AGC Pinnacle Award for their work on this project.

    See project
  • Petronas Tower II, Kuala Lumpur

    -

    Tallest cast-in-place concrete frame building in the world at time of construction. As the lead high-rise member of the Malaysian-Japanese-US Joint Venture (MAYJAUS)...J.A. Jones Construction Co. was responsible for project management, overall critical path scheduling, direct field supervision, and tower crane / vertical transport operations.

    Other creators
    See project

Organizations

  • American Arbitration Associations

    Commercial Panel Member - Construction

    - Present

Recommendations received

More activity by Chris

View Chris’ full profile

  • See who you know in common
  • Get introduced
  • Contact Chris directly
Join to view full profile

Other similar profiles

Explore collaborative articles

We’re unlocking community knowledge in a new way. Experts add insights directly into each article, started with the help of AI.

Explore More

Others named Chris Ball in United States

Add new skills with these courses